Our first tier one contract! We started our journey with Community Fibre in June 2022.

Project Description

Building a network infrastructure from the trunk route through to the distribution phase. North London was the place of work putting in place a predominantly overhead network.

Challenges

North London is an extremely busy network with congested chambers and ducts. We found that our cables were being damaged by other contractors working in the same areas.

Solutions

Explaining these issues to the client and ensuring they were constantly in the loop with any of the problems we encountered. Using different methods to provide potential re routes both UG and OH. We would alwayss make sure we gave the client a second option.

End Result

A high turnover of THP each month, the only contractor to score 100% on health & safety compliance and we were the best in class contractor for Community Fibre month to month.

Testimonial

I highly recommend Spliceteq for their exceptional work in telecommunications, which consistently demonstrates technical excellence and reliability.

Their commitment to delivering high-quality services is paralleled by their rigorous adherence to health and safety standards, ensuring not only the optimal performance of their projects but also the well-being of their team and clients.

Spliceteq’s blend of technical expertise and robust safety protocols makes them a standout choice for any telecom needs.

Josh Bassett-Franklin

Head of Build

Spliceteq South Communications| Cabling | Civil Engineering | Ethernet Cabling | Fault Finding & ERS | Fibre to the Business | Fibre to the Premise | Hybrid Fibre Coax | Survey & Design | Testing | Turnkey EV Charging
Spliceteq South Communications| Cabling | Civil Engineering | Ethernet Cabling | Fault Finding & ERS | Fibre to the Business | Fibre to the Premise | Hybrid Fibre Coax | Survey & Design | Testing | Turnkey EV Charging

Homes Connected

  • Over 20,000
Spliceteq South Communications| Cabling | Civil Engineering | Ethernet Cabling | Fault Finding & ERS | Fibre to the Business | Fibre to the Premise | Hybrid Fibre Coax | Survey & Design | Testing | Turnkey EV Charging

Duration

  • 20 Months
Spliceteq South Communications| Cabling | Civil Engineering | Ethernet Cabling | Fault Finding & ERS | Fibre to the Business | Fibre to the Premise | Hybrid Fibre Coax | Survey & Design | Testing | Turnkey EV Charging

Scope Of Works

  • Test Rod & Roping
  • Pulling Subuct
  • Blowing Cable
  • Fibre Splicing
  • Fibre Testing
  • Fault Finding